Section 18.60.200. New boilers and unfired pressure vessels.  


Latest version.
  •    (a) A power boiler, low pressure boiler, or unfired pressure vessel that does not conform to the regulations adopted by the Department of Labor and Workforce Development governing new construction and installation may not be installed and operated unless it is of special design or construction, and is not covered by the regulations, or is not in any way inconsistent with the regulations, in which case the Department of Labor and Workforce Development may issue a special installation and operating permit.
       (b) A person who installs a boiler or unfired pressure vessel shall notify the Department of Labor and Workforce Development of the installation, using a form provided by the department.