Section 42.30.420. Responsibility of construction project owners.  


Latest version.
  • The owner of a construction project that will require excavation shall indicate in bid documents or contracts for construction the existence of underground facilities that the project owner knows are located inside of the proposed area of excavation. This requirement does not release the excavator from the excavator's responsibility under AS 42.30.400 - 42.30.490.

Notes


History

(Sec. 1 ch 68 SLA 1998)