Alaska Statutes (Last Updated: January 11, 2017) |
Title 46. WATER, AIR, ENERGY, AND ENVIRONMENTAL CONSERVATION. |
Chapter 46.14. AIR QUALITY CONTROL. |
Article 46.14.02. EMISSION CONTROL PERMIT PROGRAM. |
Section 46.14.150. Time for submission of operating permit applications.
Latest version.
-
(a) The owner and operator of a stationary source required to have an operating permit under this chapter shall submit the required application and other information required by the department by regulation no later than 12 months after the date on which the stationary source becomes subject to AS 46.14.120(b).
(b) The department may accept and begin processing applications filed earlier than the submission date. Applications filed earlier may be given priority for permit issuance.
Authorities
46.14.275
Notes
Implemented As
18 AAC 15.185
18 AAC 15.195
18 AAC 15.200
18 AAC 15.210
18 AAC 15.220
18 AAC 15.225
18 AAC 15.230
18 AAC 15.235
18 AAC 15.237
18 AAC 15.240
18 AAC 15.245
18 AAC 15.250
18 AAC 15.255
18 AAC 15.270
18 AAC 15.280
18 AAC 15.290
18 AAC 15.300
18 AAC 15.305
18 AAC 15.310
18 AAC 15.320
18 AAC 15.340
18 AAC 15.920
18 AAC 50.326
18 AAC 50.560
18 AAC 50.990
References
18 AAC 50.326
AS 46.14.275 Timely and complete application as shield.
History
(Sec. 2 ch 74 SLA 1993; am Sec. 17 ch 46 SLA 2003)