Section 42.30.400. Excavator's notice of proposed excavation.  


Latest version.
  •    (a) Before beginning an excavation, an excavator shall give notice of the proposed excavation to each underground facility operator who has an underground facility in the area of the proposed excavation and request the operator to field mark the location of its underground facility. The excavator shall notify an underground facility operator who subscribes to a notification center by giving notice to the center. The excavator shall notify an underground facility operator listed in the applicable telephone directory who is not a subscriber to a notification center by giving notice directly to the operator.
       (b) Except in the case of an emergency locate request or a request to locate in a remote, unstaffed, or inaccessible location, the excavator shall notify an underground facility operator who may have a facility in the area of a proposed excavation at least two but not more than 15 working days before the date scheduled for beginning the excavation. In the case of a request to locate in a remote or unstaffed location, the excavator shall notify the operator at least 10 but not more than 20 working days before the scheduled date for beginning excavation.
       (c) In an emergency, the excavator shall immediately notify each underground facility operator in the area of the emergency and of the need for the excavation and request prompt location of underground facilities.

Authorities

42.30.420;42.30.440;42.30.450;42.30.460;42.30.490

Notes


References

AS 42.30.420 Responsibility of construction project owners.
AS 42.30.440 Penalties; injunctive relief.
AS 42.30.450 Waiver of requirements by written agreement.
AS 42.30.460 Underground facility owner.
AS 42.30.490 Definitions.
History

(Sec. 1 ch 68 SLA 1998)