Section 46.14.275. Timely and complete application as shield.  


Latest version.
  • If an owner and operator have submitted a timely and complete application for a permit or a permit renewal, as applicable, but final action has not been taken on the application, the owner's and operator's failure to have an operating permit is not a violation of this chapter unless the delay in final action was due to the failure of the owner and operator to submit, in a timely manner, additional information required or requested to process the application. An owner and operator required to have an operating permit under this chapter are not in violation of the operating permit program established under this chapter before the date on which the owner and operator are required to submit an application under AS 46.14.150.

Authorities

46.14.120;46.14.160

Notes


References

18 AAC 50.502
AS 46.14.120 Permits for construction, installation, modification, or operation.
AS 46.14.160 Completeness determination.
History

(Sec. 2 ch 74 SLA 1993)